Stage 1a

Stage 1a

    Front structural steel installed between party walls and bolted together. Structural wall built to support roof. New timber roof joints installed and suspended from structural steel beams.

    Stage 1b

    Stage 1b

      Front structural steel installed between party walls and bolted together. Structural wall built to support roof. New timber floor joints installed and suspended from structural steel beams.

      Stage 2a

      Stage 2a

        Erection of a rear dormer  a big day in the transformation of your home.

        Stage 2b

        Stage 2b

          The framework for the dormer is completed in a day at the end of which it is securely weathered against the elements.

          Stage 2c

          Stage 2c

            A built dormer from the inside, all ready for the next stages.